Several sections of IATF 16949:2016 now specifically reference the Core Tools, including:
Section 4.4.1.2: Product safety
Section 8.3.4.1: Monitoring
Section 8.3.4.3: Prototype program
Section 8.5.1.1: Control plan
Section 8.5.1.4: Verification after shutdown
Section 8.5.6.1: Control of changes – supplemental
Section 8.6.1: Release of products and services — supplemental
Section 8.7.1.4: Control of reworked product
Section 9.1.1.2: Identification of statistical tools
Section 9.2.2.3: Manufacturing process audit
Section 10.2.4: Error-proofing
Section 10.3.1: Continual improvement – supplemental
Here are some excerpts...
Section 4.4.1.2: Product safety
This section includes identification of statutory requirements; identifying and controlling product-safety-related characteristics both during design and at point of manufacture; defining responsibilities, escalation processes, reaction plans, and the necessary flow of information including top management and customers; receiving special approvals for FMEAs and Control plans; product traceability measures; and cascading of requirements throughout the supply chain.
Section 8.3.4.1: Monitoring
This could include, for example, the periodic update of customer APQP schedule milestones, gate reviews, and open issues lists related to development activities.
Section 8.5.1.1: Control Plan
Section 8.5.1.4: Verification after shutdown
Section 8.5.6.1: Control of changes – supplemental
FMEAs should be reviewed for any manufacturing or product changes, prior to implementation. Production trial run activities should be planned based on the risk and complexity of the changes.
Section 8.3.4.3: Prototype program
Regardless of whether the work is performed by the organization or by an outsourced process, the prototype program and control plan are part of the scope of the QMS.
Section 8.6.1: Release of products and services — supplemental
Section 8.7.1.4: Control of reworked product
The risk analysis and customer approval requirements are interrelated; FMEAs should identify and address risks related to each possible rework of the characteristics stated in the control plan.
Section 9.1.1.2: Identification of statistical tools
Section 9.1.1.2: Identification of statistical tools
Section 9.2.2.3: Manufacturing process audit
The audit must also evaluate the effective implementation of the process risk analysis, control plan, and associated documents.
Section 10.2.4: Error-proofing
Section 10.3.1: Continual improvement – supplemental
Changes in this section clarify the minimum process requirements for continual improvement: identification of methods, information and data; an improvement action plan that reduces variation and waste; and risk analysis (such as FMEA).
The AIAG Core Tools Software Project team is working hard to help the international automotive global supply chain meet these requirements with an intuitive, easy to use, and inexpensive SaaS offering.